CARRICKFERGUS MARINA PROJECT
REFERBISMENT OF RAILINGS AND LAMP POSTS
Refurbishment of all 520m of paneling - 95 x Posts - 32 lighting lamp posts.
- All paneling was removed off-site via manitou & HGV transport. Then cleaned, sanded, and resprayed before being re-installed.
- 95 x posts & 35 x Lighting lambs all cleaned, sanded, and repainted on-site.
- Site fencing was installed on all open areas to keep the walkway clear and safe for the public to enjoy.
Fantastic 3-week turnaround by our maintenance team!